PPR Equal Tee Green Qatar
PPR Equal Tee Green Qatar
The PPR Equal Tee is a three-way heat fusion pipe fitting used to branch a PPR pipeline into two directions while maintaining equal pipe diameter on all three ends. It is one of the most frequently used fittings in building plumbing and MEP water distribution systems
installed wherever a water supply line needs to split and feed two separate directions or fixtures simultaneously. All three female socket ends are heat fusion welded for permanent, leak-free connections. Compatible with PN16 and PN20 PPR pipes. SSK Trading supplies PPR equal tees in bulk to MEP contractors and plumbers across Qatar.
Key Features
- 3-way equal fitting — same diameter on all three ends
- All three ends female socket — heat fusion welded
- Compatible with PN16 and PN20 PPR pipes
- Smooth internal bore — consistent flow across all branches
- Corrosion-free green PPR body
Contact us via WhatsApp +974 30222532 or use the RFQ button
above for bulk pricing and stock availability.
| Specification | Details |
|---|---|
| Type | Equal Tee (3-way) |
| Material | PPR — Polypropylene Random Copolymer |
| Color | Green |
| Connection | Heat fusion welding all three ends |
| Ends | 3 × female socket — equal diameter |
| Compatible | PN16 and PN20 PPR pipes |
| Sizes | 20, 25, 32, 40, 50, 63, 75, 90, 110 |
Product features
Product features
Three-way PPR equal tee with female socket on all three ends for
pipeline branching using heat fusion welding. Equal diameter on all
three connections. Compatible with PN16 and PN20 PPR pipes. Most
widely used PPR branch fitting in MEP and building plumbing Qatar.
Materials and care
Materials and care
Material: PPR | Color: Green | Type: Equal Tee
Connection: Heat fusion welding all three ends
Compatible: PN16 and PN20 PPR pipes
Clean and dry all three ends before fusion welding.
Merchandising tips
Merchandising tips
When installing a tee on a live pipeline section, always plan the
branch direction before welding — the tee branch cannot be rotated
after the fusion joints set, so correct orientation is critical.
Weld the two run ends first to lock the tee position, then weld
the branch end — this gives better stability and alignment control
during the installation sequence.
Share

Submit Your RFQ / Inquiry
Your RFQ has been submitted successfully!